Files
MeltMind/AGENTS.md
T

13 lines
2.6 KiB
Markdown

# MeltMind project collaboration
- Before moving on from a major result or entering a new stage, follow `docs/collaboration-stage-review-policy.md`: consolidate evidence across the team, revisit the user's research goal and prior work, discuss disagreements, and record the next-stage decision.
- Continue the existing shared design and its fixed commits. Check for an existing draft or running task before starting another. Claude integrates and reviews; MeltAstra supplies execution evidence; MoldAstra supplies mathematical/grouping boundaries; Grok performs only needed targeted checks.
- Keep topology/local-type partitioning and true connectivity as independent open hypotheses. A failed input-coverage mechanism is not a failure of all partition or topology routes.
- Design/document review and information sharing do not authorize new scientific computation or training. Carry out the scope already authorized; record explicit scope and budgets before expanding it.
- The user has authorized project information sharing in their controlled Drive, Git and Slack spaces; see `docs/sharing-authorization-2026-11-14.md`. Do not ask for the same sharing authorization again. Git identity discussion is not a priority.
- Preserve original data, failures, review limitations and immutable evidence. Do not label proposals as executed or reviewed results.
- Current E1 scope follows the standing continue-work authorization relayed in Slack `1794651141.035699` and Claude caps `1794651169.320839`: bounded CPU-only label-free preparation and synthetic checks may proceed after the count checkpoint, without another user approval loop. Total 16 CPU-hours / 25 GiB, at most 8 processes, per-job 30 min / 1.25 GiB tree RSS, at most 2000 registration pairs; the 10-part stage additionally stays sequential within 3 h / 5 GiB. Never read labels, fit models, use GPU, run pilot/full matrix, or exceed caps in this scope. See `docs/s2-e1-budget-checkpoint-2026-11-14.md`.
- Post-witness update (2026-11-14 21:12) supersedes treating the preceding E1-only scope as the entire remaining project scope. Follow the latest section of `docs/collaboration-stage-review-policy.md` and Claude Slack `1794661944.308269`: custody join, label-free copy calibration, k=3 per-route candidate count, bounded registration (up to 4000 pairs / 100 worker CPU-h / 16 workers), band review, component freeze, then coordinated S2 continuation. No repeated approval gates or reruns of completed review; preserve concrete execution limits and distinguish future stages from completed work. User preference: tens of CPU-hours alone are not a reason to block progress. No additional scientific task is implied by this preference.