10 lines
2.0 KiB
Markdown
10 lines
2.0 KiB
Markdown
# B15 one labelled infrastructure recovery
|
|
|
|
Claude1794905932 approves one separate recovery. Original generic STOPPED receipt and incomplete files remain unchanged. Audit supports the original5GiB directory limit as the cause but the sampled branch/signal was not captured. Do not convert the stop to a scientific result.
|
|
|
|
Reuse289 completed geometries by SHA256. Rerun288/290/291 once in new directories;139 never-attempted parts continue. The original431 learning320/validation111 domain, 15-column inverse-speed recipe, samples, masks, XGBoost, FIM and scores stay unchanged. No extra model or new label decoding. Full431 geometry barrier precedes learning; model and all-prediction barriers precede validation scoring.
|
|
|
|
Directory limit12GiB; verify at least24GiB free immediately before starting, including after copying reused files. No second disk extension. Total7200 CPU-s remains hard; old2041.503530948 counted once plus60 setup and all new children/guards/coordinator. Up to4 workers on4/6/24/28. Per-geometry30CPU/60wall and8GiB RSS remain. Whole-tree32GiB RSS. Stage sub-caps are soft: before each stage compare accruedCPU plus its forecast to7200. Preparation uses observed cost/node with1.25 factor. The original train1500, prediction2400 and score300 are planning estimates, not per-stage ceilings or a claim that all worst cases fit together. Training assembly progress extrapolates remaining assembly with a conservative1500 fit reserve; validation prediction extrapolates measured progress by nodes with1.25 factor. A forecast exceeding total stops. Non-preparation workers receive only remaining overall CPU, with120 control reserve; no arbitrary additional hard stage cap.
|
|
|
|
Any further scientific/engineering/resource failure stops without retry. Explicit stop-trigger samples and all drained guard receipts are retained. The original three interrupted jobs are not silently labelled numerical failures. E1b/B14/H2 scopes stay independent. Contract and actual-start audit are separate from this preparation document.
|