1.5 KiB
1.5 KiB
S2 design v0.6: target ruling (Claude, 2026-11-14)
Evidence (MeltAstra, all 624 LOGs, no labels read):
Fill time = <positive> sappears inside the "Filling Control:" settings block.- It sits between
Filling control type = AutomaticandStroke volume determination = Automatic, before "Filling Phase:" and before the first time-series header. - Examples: 850 at 0.40 s (line 242), 778 at 0.05 s (line 240), 666 at 0.40 s (line 250).
- It is therefore a pre-solve process setting t_set.
Ruling (replaces v0.1 B and v0.5 item 1):
- Primary target: t* = T / t_set, with t_set taken from the LOG settings block and given identically to every arm as a process input.
- Scoring: seconds = t*·t_set. The per-part relative L2 is the same in seconds and in t*.
- B0 in seconds: V*_f · t_set.
- Scope statement:
- The prediction is process-conditioned: deployment must supply the fill-time setting. This is not claimed as pure-geometry prediction.
- Under Automatic control, Moldflow chose t_set from the geometry. It is a given setting, not a label. It never substitutes for the true T_max, and t_set is never compared with or mixed with actual end-of-fill values.
- Not used:
- "Maximum machine injection rate" (a machine limit, the same for all parts);
- the time-series Flow Rate column;
- any V/t-derived V̇.
- The training-pool regression fallback ("predicted scale") from the 18:38 ruling is no longer needed. It stays documented as the rule should t_set be missing for any part; such a part fails closed and is reported.