-
45afa47af5
Team handoff pack for new sessions

ClaudeandClaude Opus 5.5
2026-11-18 13:50:11 +00:00
-
706608dfe0
Publish fixed item c training entry, shared capacity and synthetic acceptance for Assist review
MeltAstra
2026-11-18 21:38:44 +08:00
-
5b6a953fc5
Record independent research parallelism and withdrawn unstarted throughput draft
MeltAstra
2026-11-18 21:03:33 +08:00
-
ff0033d733
Record authorized recovery actual start and first fold cost gate
MeltAstra
2026-11-18 20:19:00 +08:00
-
bfb4b7c84d
Record accepted recovery review and unexecuted auto-review launch rejection
MeltAstra
2026-11-18 20:14:13 +08:00
-
0886d459e6
Fix Track A recovery projection isolation and bounded prestart deadline
MeltAstra
2026-11-18 19:52:43 +08:00
-
ef46d35772
Prepare sole labelled Track A recovery with isolated monitoring and unchanged science
MeltAstra
2026-11-18 19:33:12 +08:00
-
32bd61e112
Preserve Track A monitor timeout and collateral stop with raw evidence and completed checkpoints
MeltAstra
2026-11-18 19:15:18 +08:00
-
8137f79be6
Adopt independent exact seed1 postfit PASS without execution
MeltAstra
2026-11-18 17:19:28 +08:00
-
e49851ba0b
Prepare exact seed1 postfit review binding without execution
MeltAstra
2026-11-18 17:15:17 +08:00
-
38f0044299
Record fixed seed1 v2 actual launch with exact independent PASS
MeltAstra
2026-11-18 16:58:55 +08:00
-
2dc2f39e37
Repair seed1 v2 observation coverage and preserve original BLOCKED review
MeltAstra
2026-11-18 16:50:51 +08:00
-
bf7363bf96
Freeze seed1 v2 total projection and both historical charges for narrow review
MeltAstra
2026-11-18 16:40:47 +08:00
-
d3c94a0069
Preserve terminal seed1 continuation per-fold projection stop and full raw evidence
MeltAstra
2026-11-18 16:34:19 +08:00
-
90085f1842
Record actual single seed1 continuation launch and independent PASS
MeltAstra
2026-11-18 15:19:06 +08:00
-
9535201ac7
Freeze single labelled seed1 continuation with old cost inside final ceilings
MeltAstra
2026-11-18 15:12:21 +08:00
-
a45e375d0e
Preserve seed1 projected-budget stop with complete raw terminal evidence
MeltAstra
2026-11-18 14:55:40 +08:00
-
8108e52cd5
Record adopted seed1 PASS and actual two-worker launch with first-epoch cost gates
MeltAstra
2026-11-18 14:46:16 +08:00
-
8c5020c5cb
Fix seed1 dispatch to select actually idle eligible GPUs before assignment
MeltAstra
2026-11-18 14:38:42 +08:00
-
c0f89a5e95
Preserve item1 terminal results and freeze seed1 training review entry
MeltAstra
2026-11-18 14:31:37 +08:00
-
3c05a466c1
research-tree: correct item-1 g sign reading

ClaudeandClaude Opus 5.5
2026-11-18 06:29:15 +00:00
-
9e2b687bd3
research-tree: phase 3 item 1 result

ClaudeandClaude Opus 5.5
2026-11-18 06:28:12 +00:00
-
888f706612
Freeze Track A postfit entry and record actual item1 recovery start
MeltAstra
2026-11-18 14:19:09 +08:00
-
581208098f
Prepare one labelled item1 postfit recovery with bounded idle wait
MeltAstra
2026-11-18 14:04:43 +08:00
-
4f646232f4
Record actual independent Track A review adoption and unique GPU training start
MeltAstra
2026-11-18 12:29:47 +08:00
-
2cf0a0307d
Prepare reviewed-scope Track A H2 training entry and synthetic acceptance
MeltAstra
2026-11-18 12:18:33 +08:00
-
1eae27ade8
Verify Track A baseline reuse and existing complete v4 graph inputs
MeltAstra
2026-11-18 11:53:30 +08:00
-
479b2f5273
Stage plan: synthesis update, frozen Track A/B protocols, idle-GPU rule

ClaudeandClaude Opus 5.5
2026-11-18 03:42:19 +00:00
-
10ca86a920
Archive original Track C and D proposals and research direction clarifications
MeltAstra
2026-11-18 11:42:04 +08:00
-
e86142a79b
Plan: correct Gre24 reference numbers; Track A compares on same re-created split

ClaudeandClaude Opus 5.5
2026-11-18 03:36:08 +00:00
-
224daf76e0
Stage research plan: Greif/GINO SOTA tracks, data generation, pretraining, RL

ClaudeandClaude Opus 5.5
2026-11-18 03:22:48 +00:00
-
d14ffd8232
research-tree: S2 last-fill diagnostic reading

ClaudeandClaude Opus 5.5
2026-11-18 02:34:03 +00:00
-
98519a6c36
Include actual parallel budget review with S2 diagnostic results
MeltAstra
2026-11-18 10:32:57 +08:00
-
73b531a3dd
Publish complete descriptive S2 volume-tail and peak diagnostic
MeltAstra
2026-11-18 10:31:51 +08:00
-
1ed44f70fc
Enforce running coordinator CPU allowance for S2 diagnostic
MeltAstra
2026-11-18 10:27:28 +08:00
-
b97674a1d4
Prepare descriptive S2 volume-tail diagnostic for lightweight code review
MeltAstra
2026-11-18 10:15:29 +08:00
-
a5f44f3a5a
Receive Mold item c volume-tail and peak-stability paper specification
MeltAstra
2026-11-18 09:44:00 +08:00
-
17453b4822
Narrow B15 lesson per MoldAstra review

ClaudeandClaude Opus 5.5
2026-11-18 01:37:16 +00:00
-
34aedf01d9
Record mandatory independent six training receipt monitor audit before postfit
MeltAstra
2026-11-18 06:10:59 +08:00
-
bb888c902f
Accept exact item1 postfit PASS and validate runtime review binding
MeltAstra
2026-11-18 05:59:03 +08:00
-
365460302b
Reject lower-level monitor errors in item1 postfit wrapper; preserve original receipt
MeltAstra
2026-11-18 05:52:26 +08:00
-
1f7fccbbfa
Prepare one item1 postfit review with runtime custody and unchanged comparison
MeltAstra
2026-11-18 05:44:42 +08:00
-
1c6aeeb566
Publish exact item1 review, unique actual start and first-four cost gates
MeltAstra
2026-11-18 05:04:01 +08:00
-
8b7e2af404
research-tree: phase 3 item 1 running

ClaudeandClaude Opus 5.5
2026-11-17 21:02:44 +00:00
-
ae089067a1
Prepare amended phase3 item1 six-fit entry with complete schedules and120000GPU-s cap
MeltAstra
2026-11-18 04:55:33 +08:00
-
30c34b0e66
Prepare phase3 item1 frozen training entry for exact semantic review
MeltAstra
2026-11-18 04:50:41 +08:00
-
2338dfe997
Publish H2-S2 terminal evidence, independent audit and descriptive folds1-4
MeltAstra
2026-11-18 04:44:33 +08:00
-
c9584a664a
research-tree: H2 confirmed on field, last fill worse; phase 3 triggered

ClaudeandClaude Opus 5.5
2026-11-17 20:22:24 +00:00
-
b89762e925
Publish complete gate outcome evidence and conditional phase3 plan
MeltAstra
2026-11-18 00:15:13 +08:00
-
64d6c1b30d
research-tree: gate calibration v2 failed; holdout blocked

ClaudeandClaude Opus 5.5
2026-11-17 16:04:32 +00:00
-
e90d964146
Publish new canonical gate postfit review binding and unchanged Assist literature
MeltAstra
2026-11-17 23:19:18 +08:00
-
015cb14dfa
Publish measured gate v2 continuation start and adopted S2 semantic PASS
MeltAstra
2026-11-17 23:06:24 +08:00
-
8354a2f6c0
Publish exact H2 S2 pooled scorer review binding, no postfit launch
MeltAstra
2026-11-17 22:56:30 +08:00
-
f601f8fe46
Phase 2 retrospective and priorities

ClaudeandClaude Opus 5.5
2026-11-17 14:51:55 +00:00
-
0436fba83f
Publish actual H2 S2 start and passing four-fold first-epoch cost gate
MeltAstra
2026-11-17 22:23:18 +08:00
-
508ea39d00
Freeze four-fold H2 S2 training queue and cumulative budget
MeltAstra
2026-11-17 22:17:38 +08:00
-
126d6d3055
research-tree: correct H2-S1 wording (fold-0 only; S2 not started)

ClaudeandClaude Opus 5.5
2026-11-17 13:58:42 +00:00
-
5fbf24ed53
Publish H2 S1 final200 predictions scores review and terminal evidence
MeltAstra
2026-11-17 21:57:37 +08:00
-
3b7973cfb1
research-tree: H2-S1 passed; S2 rule pre-registered

ClaudeandClaude Opus 5.5
2026-11-17 13:56:15 +00:00
-
7c6ea4f312
Freeze H2 final200 prediction and scoring entry for semantic review
MeltAstra
2026-11-17 21:48:50 +08:00
-
0a45935ee4
Record conditional calibration review scope and actual H2 dependency audit
MeltAstra
2026-11-17 21:14:55 +08:00
-
7e2afaf2c6
Record final calibration budget amendment and preserve exact original PASS identity
MeltAstra
2026-11-17 21:04:48 +08:00
-
1960762d2d
Publish fixed calibration postfit implementation and pre-score review binding
MeltAstra
2026-11-17 20:43:20 +08:00
-
1cdd5618b7
research-tree: B17 pruned

ClaudeandClaude Opus 5.5
2026-11-17 12:24:09 +00:00
-
d67da6382b
Publish B17 terminal evidence and gate calibration v2 fixed execution scope
MeltAstra
2026-11-17 20:23:41 +08:00
-
1e1d5a6515
Publish bounded phase2 decisions and immutable evidence mapping without bulk history
MeltAstra
2026-11-17 19:39:05 +08:00
-
2b155975c3
research-tree: B17 last-fill branch opened

ClaudeandClaude Opus 5.5
2026-11-17 11:38:58 +00:00
-
708bc2c165
research-tree: B16 pruned; next steps (fresh holdout, H2 data test)

ClaudeandClaude Opus 5.5
2026-11-17 11:25:06 +00:00
-
a42e02336d
research-tree: B13-E2 pruned

ClaudeandClaude Opus 5.5
2026-11-17 10:44:19 +00:00
-
694d2faa66
research-tree: B15 pruned; B16 opened

ClaudeandClaude Opus 5.5
2026-11-17 10:33:25 +00:00
-
775f490c2c
research-tree: B14 pruned (fixed recipe)

ClaudeandClaude Opus 5.5
2026-11-17 10:25:00 +00:00
-
a5092e907b
research-tree: B13-E1b confirmed; E2 released

ClaudeandClaude Opus 5.5
2026-11-17 09:30:11 +00:00
-
937a6a65c5
research-tree: E1 coverage park, E1b opened, B14 per-part cap

ClaudeandClaude Opus 5.5
2026-11-17 08:44:54 +00:00
-
7b470069f7
Freeze labelled B14 B15 budget continuations retaining completed10 and original costs
codex/s2-execution-diff-20261114
Frank14f
2026-11-17 16:39:39 +08:00
-
783608f73b
Freeze B13 E1 five-fold test confirmation and exact baseline reuse
Frank14f
2026-11-17 16:37:38 +08:00
-
ebffc16787
research-tree: E1 test roles, E2 spec accepted with amendments, B15/B14 budgets

ClaudeandClaude Opus 5.5
2026-11-17 08:36:21 +00:00
-
0e165fc21a
Research tree: B1 parked (small field gain only), B10x/B14 parked, B15 started

ClaudeandClaude Opus 5.5
2026-11-17 08:25:42 +00:00
-
03f6fa2c8f
Research tree: B13 expanded (fold0 field gain), E1/E2 next

ClaudeandClaude Opus 5.5
2026-11-17 08:24:59 +00:00
-
76dea96bd2
Publish audited B1 B12 B13 B10 B14 terminal decisions and retained limitations
Frank14f
2026-11-17 16:23:21 +08:00
-
7a91633244
Freeze approved B15 fixed tet-speed supervised solver gate
Frank14f
2026-11-17 16:23:00 +08:00
-
47c85a8a14
Freeze approved B14 exact channel-family geometry gate
Frank14f
2026-11-17 16:16:09 +08:00
-
8ea58fe9d2
Freeze one labelled B10 LOG member recovery with real directory acceptance
Frank14f
2026-11-17 16:13:18 +08:00
-
7575a467b5
Phase2 phase2-b13-gate-2026-11-17 predictions immutable barrier
Frank14f
2026-11-17 16:09:42 +08:00
-
3b2156e8c4
Phase2 phase2-b13-gate-2026-11-17 model immutable barrier
Frank14f
2026-11-17 16:09:32 +08:00
-
7a7174746d
Freeze approved H2 S1 fold0 last-epoch200 training amendment
Frank14f
2026-11-17 16:08:56 +08:00
-
a864b29563
Phase2 phase2-b13-gate-2026-11-17 features immutable barrier
Frank14f
2026-11-17 16:05:11 +08:00
-
b5531b4c0b
Freeze approved twenty-part B10 numerical field validity audit
Frank14f
2026-11-17 15:54:25 +08:00
-
fdd079d3b6
Freeze B1 scoring-only budget amendment and exact 29 unfinished jobs
Frank14f
2026-11-17 15:46:53 +08:00
-
78b9372aae
Research tree: B12 pruned; H2 staged (fold0 first), GPU budget 40h

ClaudeandClaude Opus 5.5
2026-11-17 07:46:32 +00:00
-
6c42bfb1ce
Freeze reviewed H2 pilot contract data guards and cost projection
Frank14f
2026-11-17 15:41:12 +08:00
-
00ec7cacf8
Phase2 phase2-b12-gate-2026-11-17 predictions immutable barrier
Frank14f
2026-11-17 15:40:34 +08:00
-
f3bd181d4e
Phase2 phase2-b12-gate-2026-11-17 model immutable barrier
Frank14f
2026-11-17 15:40:23 +08:00
-
bd88e3ae60
Research tree: B14 probing, B15 opened (learned speed + eikonal solve), lit check, B1-v2 extension

ClaudeandClaude Opus 5.5
2026-11-17 07:37:23 +00:00
-
f5d3f22b3a
Phase2 phase2-b12-gate-2026-11-17 features immutable barrier
Frank14f
2026-11-17 15:36:32 +08:00
-
7054acdbe0
Freeze H2 graph-token implementation and nonzero gradient CPU acceptance
Frank14f
2026-11-17 15:34:57 +08:00
-
c1e2077e8a
Record sole B12 B13 serial launch and CPU isolation
Frank14f
2026-11-17 14:56:48 +08:00
-
b685ecd3f3
Freeze approved B12 path and B13 context one-fold gates
Frank14f
2026-11-17 14:55:26 +08:00
-
24f8a97e33
Record Claude stage consolidation and bounded future dependencies
Frank14f
2026-11-17 14:22:41 +08:00
-
8783165044
Research tree: scope B6 conclusion; B13 failure does not close O1

ClaudeandClaude Opus 5.5
2026-11-17 06:22:18 +00:00
-
da1efdb1d9
Consolidate terminal B6 B7 B11 evidence and sole live B1 recovery
Frank14f
2026-11-17 14:21:22 +08:00