research-tree: H2-S1 passed; S2 rule pre-registered
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
1cdd5618b7
commit
3b7973cfb1
1 file changed
+2
-1
@@ -12,7 +12,7 @@ Rules:
|
||||
| ID | Branch | Gate (cheapest falsifier) | Owner | Status |
|
||||
|---|---|---|---|---|
|
||||
| B1 | H1: residual on the eikonal volume map (t* - cF, same 19 features) | full run is cheap (<= 20 CPU-h) | spec Mold, run Melt | PARKED (inconclusive under the fixed rule) |
|
||||
| B2 | H2: geometry-aware operator on the H1 target | pilot <= 2 GPU-h with a cost gate | spec MeltAssist, run Melt | PROMOTED (after the B1 contract) |
|
||||
| B2 | H2: geometry-aware operator on the H1 target | pilot <= 2 GPU-h with a cost gate | spec MeltAssist, run Melt | S1 PASSED (fold 0, field -7.5 % rel. vs A) → S2 running |
|
||||
| B3 | Arrival-field topology: dry-region H0(-T) maxima and saddles as last-fill / front-meeting diagnostics | on about 50 parts, compute the diagnostics from the true T and from the full-node EIK; check whether they are stable and whether EIK's critical points match the truth | spec Mold, run Melt | OPEN |
|
||||
| B4 | Filling as a filtration: one scalar potential plus a monotone time map | oracle: the best per-part monotone map from the EIK potential to the true T; the remaining error is ordering error that no time map can fix | Mold / Melt | PRUNED (clock-only on a fixed potential cannot beat A) |
|
||||
| B5 | Sheet / paired-wall decomposition on real meshes | scope a relaxed general-domain certificate on paper; then try 10 Greif parts and report coverage and false connections | Mold, then Melt | PARKED (coverage unknown: certifier complexity cap) |
|
||||
@@ -34,6 +34,7 @@ Rules:
|
||||
| P3 | O1 with size-matched K = 8 partitions | — | — | PRUNED (eligibility 23 %; lesson: control cut area as a covariate, do not match it) |
|
||||
|
||||
Log (newest first):
|
||||
- 2026-11-17: **H2-S1 (fold 0 test, 121 parts / 37 components, one seed).** Pre-score review PASS (MeltAssist 07514084). Field H2 .06747 vs A .07292: Δ -.00546, CI [-.01035, -.00098], about 7.5 % relative, the largest gain in the tree (E1b five-fold was about 1.6 %). Last fill +.110, CI [-.134, +.393] (no support); τ CI crosses 0. 7,786 full-node / 145 query predictions negative (kept, not clipped). S2 gate passed. **Pre-registered before S2 results:** H2 is CONFIRMED if the pooled five-fold (552 / 204 test) field upper bound vs A < 0; vs B13-E1b reported, not gating. Single fold / seed: no causal or cross-split claim yet. Data-sufficiency test (Mold e24fff7c) follows S2 under its own cap.
|
||||
- 2026-11-17: **B17 PRUNED (stage 1).** 552 / 204, pre-score review PASS (MeltAssist 235cfc9f, after one score-assembly fix). Last fill Δ (new - E1b) -.0033, CI [-.0389, +.0298]; it needed mean ≤ -.010 and upper < 0. Stage 2 not run. Cost 4,745 / 10,800. **Learned:** the B14 / B16 last-fill near-misses do not survive a dedicated, tail-weighted recipe. Last fill stays unsolved by the tabular feature route; it is not closed for learned representations (H2) or for other targets. Gate calibration v2 (outcome-level, 72k CPU-s) running; the fresh holdout remains useful for an independent deployment check of E1b.
|
||||
- 2026-11-17: **B17 opened** (MoldAstra spec b5bd8a4e, accepted as written). Stage 1 = screening only on the already-used 552 parts; stage 2 = one unsealing of the fresh holdout. B14 / B16 near-misses are one hint, not two. Fresh holdout: 94 candidates sealed (a2dac8d1 / manifest a5a133a2; 72 source groups, 42 / 40 new tokens); gate extractor must first reproduce the LOG gates on the 552. The 10 GB evidence is copied to /home and hash-verified (not a remote backup).
|
||||
- 2026-11-17: **B16 PRUNED (fixed combination recipe).** 552 / 204 test parts, pre-score implementation review PASS (MeltAssist, 8cdd3ff4). New - E1b field +.00014, CI [-.00051, +.00079]; last fill -.039, CI [-.090, +.004]; τ -.0011, CI [-.0019, -.0004] (worse). New - A field -.00099, CI crosses 0. **Learned:** the H1-RES target does not add to B13 context. Last fill is a near-miss again (B14 too). Two near-misses on the same data are a hint, not evidence: any last-fill branch must be confirmed on *fresh* parts. **Next:** (1) v2 extra parts (94, 42 from new families) prepared as a sealed fresh holdout; (2) H2 data-sufficiency test (Mold e24fff7c) after H2-S1; (3) CAD pretraining (Mold 8114bc3c) parked behind H2 (it needs a learned model worth pretraining); (4) Mold to spec one last-fill-targeted branch, confirmation only on the fresh holdout. Literature (MeltAssist 1-3/3): video-model OOD physics failure has limited support (Kang et al. ICML 2025, controlled 2D); PDE pretraining sample efficiency has evidence (Poseidon, CoDA-NO); generation on irregular meshes has precedents, but there is none for 3D volume filling or calibrated uncertainty; CAD sets give geometry only.
|
||||
|
||||
Reference in new issue
Block a user