Commit Graph
29 Commits
Author SHA1 Message Date
MeltAstra 31a20abd43 Publish fixed regional-context item b entry and adopted item1b review with capacity hold 2026-11-18 22:32:23 +08:00
MeltAstra ffd5c92958 Publish fixed item1b full100epoch training entry and acceptance for Assist review 2026-11-18 22:18:17 +08:00
MeltAstra 706608dfe0 Publish fixed item c training entry, shared capacity and synthetic acceptance for Assist review 2026-11-18 21:38:44 +08:00
MeltAstra c0f89a5e95 Preserve item1 terminal results and freeze seed1 training review entry 2026-11-18 14:31:37 +08:00
MeltAstra 10ca86a920 Archive original Track C and D proposals and research direction clarifications 2026-11-18 11:42:04 +08:00
MeltAstra a5f44f3a5a Receive Mold item c volume-tail and peak-stability paper specification 2026-11-18 09:44:00 +08:00
MeltAstra 1e1d5a6515 Publish bounded phase2 decisions and immutable evidence mapping without bulk history 2026-11-17 19:39:05 +08:00
Frank14f 7a91633244 Freeze approved B15 fixed tet-speed supervised solver gate 2026-11-17 16:23:00 +08:00
Frank14f 47c85a8a14 Freeze approved B14 exact channel-family geometry gate 2026-11-17 16:16:09 +08:00
Frank14f 6c42bfb1ce Freeze reviewed H2 pilot contract data guards and cost projection 2026-11-17 15:41:12 +08:00
Frank14f b685ecd3f3 Freeze approved B12 path and B13 context one-fold gates 2026-11-17 14:55:26 +08:00
Frank14f 086c56dc36 Fix B7 rank and B6 HKS gates behind existing B1 recovery 2026-11-17 14:00:45 +08:00
Frank14f 5b676d4c31 B11 approved persistence reconstruction gate and synthetic acceptance 2026-11-17 13:12:03 +08:00
Frank14f 4d19c03080 B3 B4 approved learning-panel gates and synthetic acceptance 2026-11-17 12:37:02 +08:00
Frank14f 7cb1f1c146 docs: incorporate H2 review and preserve revised design evidence 2026-11-17 11:55:55 +08:00
Frank14f 0a60f5d6fd research: prepare B1 residual contract and physics branch findings 2026-11-17 11:39:46 +08:00
Frank14f 705270210d research: publish physics map and bounded paired-wall synthetic probe 2026-11-17 11:18:02 +08:00
Frank14f fc2d523129 Archive run and literature indexes with historical source provenance 2026-11-17 10:02:17 +08:00
Frank14f a946adfb02 Freeze approved O1 scientific v2 same-sixty geometry gate 2026-11-17 05:32:30 +08:00
Frank14f 7f820b76ea Freeze O1 A-base execution contract and existing METIS availability evidence 2026-11-17 04:35:57 +08:00
Frank14f 76978c4278 Record R4a completed paired results and immutable terminal audit 2026-11-16 20:45:44 +08:00
Frank14f f9633bd219 Draft R4a shared-speed contract for single main review 2026-11-16 18:50:41 +08:00
Frank14f 8409910b1e Implement Gre24 reproduction and freeze v5 preparation evidence 2026-11-15 23:28:33 +08:00
Frank14f 24d2da0fe7 Inventory existing G1 material and validate virtual scheduler contract 2026-11-14 19:11:38 +08:00
Frank14f bf03ee8dce Close G1 and A1-A4 paper rulings and distinguish execution evidence from design approval 2026-11-14 17:44:07 +08:00
Frank14f 3d3c2bd4e8 Absorb S2 v0.3 rulings, verify pinned licenses, and maintain scope-specific entry status 2026-11-14 17:36:38 +08:00
Frank14f 33b18e0831 Reconcile S2 execution differences with Claude v0.2 rulings and remaining definitions 2026-11-14 17:25:56 +08:00
Frank14f c35b02d9e3 Track adopted v0.1a correction and retain unresolved execution questions 2026-11-14 17:17:23 +08:00
Frank14f a9902b42d0 Document S2 execution differences against unified v0.1 and preserve stage review policy 2026-11-14 17:15:58 +08:00