9.0 KiB
9.0 KiB
MeltMind research tree (Claude maintains it, single writer; started 2026-11-17)
Method (Yanqi): explore many branches; none has to succeed. Each branch gets a cheap gate, learns something and is pruned or expanded. Every probe, counter-example and prune reason is kept here. Goal: state-of-the-art fill prediction.
Rules:
- A branch starts with a gate: the cheapest test that could prune it (about 2 CPU-h or less, or existing outputs only). Gate criteria are written down before the run.
- Statuses: OPEN, PROBING, PRUNED (with reason), PROMOTED (gets a contract), PARKED.
- Every result records what we learned, even when the result is negative.
- At most 2 promoted branches run at a time; gates can run in parallel on free cores.
- Single writer per execution root (MeltAstra on Horsea). One review from Claude per contract.
| ID | Branch | Gate (cheapest falsifier) | Owner | Status |
|---|---|---|---|---|
| B1 | H1: residual on the eikonal volume map (t* - cF, same 19 features) | full run is cheap (<= 20 CPU-h) | spec Mold, run Melt | PROMOTED |
| B2 | H2: geometry-aware operator on the H1 target | pilot <= 2 GPU-h with a cost gate | spec MeltAssist, run Melt | PROMOTED (after the B1 contract) |
| B3 | Arrival-field topology: dry-region H0(-T) maxima and saddles as last-fill / front-meeting diagnostics | on about 50 parts, compute the diagnostics from the true T and from the full-node EIK; check whether they are stable and whether EIK's critical points match the truth | spec Mold, run Melt | OPEN |
| B4 | Filling as a filtration: one scalar potential plus a monotone time map | oracle: the best per-part monotone map from the EIK potential to the true T; the remaining error is ordering error that no time map can fix | Mold / Melt | PRUNED (clock-only on a fixed potential cannot beat A) |
| B5 | Sheet / paired-wall decomposition on real meshes | scope a relaxed general-domain certificate on paper; then try 10 Greif parts and report coverage and false connections | Mold, then Melt | PARKED (coverage unknown: certifier complexity cap) |
| B6 | Intrinsic coordinates (Laplace-Beltrami / spectral) as features | 50 parts: does a spectral feature explain A's residual (partial correlation on the learning folds only)? | MeltAssist lit, Melt run | OPEN |
| B7 | Order-aware objective (pairwise or rank loss) instead of pointwise L2 | small GBRT ranker on one fold: Kendall tau and last-fill location against A | MeltAssist / Melt | OPEN |
| B8 | Fresh hold-out from Greif v2 (42 parts, 40 new source tokens) | read-only LOG/YML, field validity and near-duplicate check | MeltAssist | PARKED (missing process provenance: v2 ZIP has 723 VTU and 0 LOG/YML, so no t_set) |
| B9 | Heat transfer / packing targets (cooling time, shrinkage) | read-only inventory of v4/v5 fields | MeltAssist | DONE (inventory) → opens B10 |
| B10 | Freeze time / volumetric shrinkage as targets with the same Gre24-style pipeline (Yanqi: fill first, so low priority) | gate: per-field validity (units, stage, mask) on 20 parts, then a Gre24-style GBRT on one fold against Gre24's reported medians (cooling about 0.095, shrinkage about 0.10) | Melt / MeltAssist | PARKED (priority) |
| B11 | Topological cleaning of predicted fields: persistence simplification removes spurious extrema and saddles before the end-of-fill and event metrics | gate: on the B3 panel, apply a fixed persistence threshold to EIK, and later to the A/H1 full-node predictions, and check event precision, last-fill distance and tau (learning folds only) | Mold spec, Melt run | OPEN |
| P1 | O2 local tensor readings | — | — | PRUNED (S1, S2, S3-A: no gain on the current recipe) |
| P2 | Own graph flow-competition solver | — | — | PRUNED (infeasible: splu resource stop, GMRES numerical failure; the idea itself is untested) |
| P3 | O1 with size-matched K = 8 partitions | — | — | PRUNED (eligibility 23 %; lesson: control cut area as a covariate, do not match it) |
Log (newest first):
- 2026-11-17: B11, EIK arm: PRUNE_THIS_FIXED_RULE_ON_THIS_ARM.
- Events before/after cleaning: TP/FP/FN 244/16956/416 → 215/13505/445.
- Precision +.0015 (gate +.010 not met); recall -.044 (allowed -.020; breached); query last-fill distance +.063 Rg (allowed +.010; breached); tau unchanged.
- Learned: about 80 % of EIK's spurious events outlive the 0.02 persistence threshold, so they are persistent structural critical points, not short-lived noise. Cleaning removes some true events and moves the end of fill. The eikonal potential's topology differs from the true field's at the structural level, which fits B4 (the order itself is wrong, not just the clock).
- The A/H1 arms are still pending B1's prediction freeze.
- 2026-11-17: B5 PARKED (coverage unknown). On 10 learning parts, 5 had no candidate; on the other 5, the first candidate hit the fixed 70000-operation complexity cap and came out UNKNOWN. 0 certified and 0 rejected; only 5/10 parts have a certified union that is complete and below .20, short of the >= 6/10 threshold.
- Learned: the relaxed paired-wall certifier is computationally infeasible on real Greif meshes at this cap. That is not a refutation of sheet decomposition.
- Reopen only with a new certifier design (no cap extension under this gate). Cost 133.7 CPU-s. Commit
6aa7baf6.
- 2026-11-17: B1 first-cell cost gate PASS (fit projection 3610 CPU-s); fits 01-04 running.
- 2026-11-17: B3 result (50 learning components):
- The true-field H0(-T) events are stable under recording-precision perturbation: precision/recall .954/.921 (0.001 grid) and .947/.915 (half grid), above the 0.80 gate.
- EIK against the truth: 244 TP, 16956 FP, 416 FN, so precision .014 and recall .370; median match distance .049 Rg.
- Learned: the eikonal field has a very large number of spurious topological events. This supports a stable diagnostic on this panel; it is not a weld-line validation.
- New branch B11 (topological cleaning).
- 2026-11-17: B4 PRUNED (clock-only). The post-hoc best monotone map of the fixed D_f potential gives a component-mean relative L2 of .0916, against A's .0664 on the same full-tet domain.
- Learned (narrowed per MeltAstra): A is not a member of the family of monotone scalar clocks on this fixed D_f, so that family alone cannot explain A's advantage. It does not attribute the advantage solely to order changes.
- This does not prune new potentials, branch information or learned ordering. Commit a6998f72; push pending.
- 2026-11-17: B1 contract
e751e5b2approved. Branch decision rule (grouped protocol, 100 % pool, paired component bootstrap, signs as H1 - A):- EXPAND: upper bound of the relative-L2 difference < 0.001, and either the last-fill distance/Rg difference has its upper bound < 0 or the Kendall tau difference has its lower bound > 0.
- PRUNE: lower bound of the relative-L2 difference > 0 and neither of those improves clearly.
- PARK otherwise.
- Topology metrics and v4 results are descriptive only.
- B8/B9 publication fixed at
1153cd8c.
- 2026-11-17: B9 full-library schema scan (MeltAssist; 1253/1253 files parsed, 0 failures, no numeric decoding). Freeze_time and shrinkage are present in every v4 and v5 part. Temperature, pressure, velocity and deflection are present in 621 of 629 v4 parts (the 8 missing ones are listed) and in all 624 v5 parts. Trajectories have 99 to 110 frames. v5 also carries cell residual stress. This shows the schema exists; the values have not yet passed any eligibility check. Opened B10 as PARKED, behind fill-time priority.
- 2026-11-17: B8 PARKED (MeltAssist; 4 Range reads, 77,714 B). Reopen if the companion LOG/YML is obtained or the VTU carries equivalent pre-solve metadata. Narrower reopen path (Claude): the 42 parts may still serve as a fresh hold-out for scale-free metrics only (Kendall tau, last-fill location, H0(-T) events), which need no t_set. They then need only field validity and the near-duplicate check, not process provenance. Narrowed by MeltAssist: the models still need the gate as an input, through D_i, D_f and F. Scale-free scoring is therefore not gate-free inference. Without equivalent metadata in the VTU or an original gate source, reopening needs a separate task built only from the available fields; recovering the gate from the minimum of the true T would be label leakage.
- 2026-11-17: MoldAstra B1 short spec + H0(-T) metric (Drive 1WHFdSP7…, SHA 91ecc62f…); one-page maths judgement (Drive 1I_H_UxU…: an order-preserving clock change cannot move ranking events; in a simplified constant-pressure counter-example, along-path loading gives a 4x fill-time difference that vanishes at constant flow); gate specs for B3/B4/B5 (Drive 1LUaoJn9…) approved as written. MeltAstra B1 contract draft
0a60f5d6plus a one-page physics finding (gate reachability and early wet islands are more direct than wet-region H0 merges; the volume quantile is a shared progress variable, not the full hydraulic state). B3/B4/B5 move to PROBING once the B1 contract is frozen. - 2026-11-17: tree started; B1/B2 promoted on Yanqi's approval; B3-B9 opened.