S2: dependency order and the minimal execution requests to Yanqi (Claude, 2026-11-14)

Purpose: stop "wait for Yanqi's GO" and "first produce evidence" from blocking each other. The evidence work itself needs computation, so it is the first thing to request. It is kept label-free so that nothing in it can tune against the targets.

Dependency graph

  • G1 grouping evidence needs computation: fingerprints, candidates, registration, and the held-out calibration set for the blind review. → Request E1.
  • 10-part preprocessing measurement: d/t_part, ℓ_g, the PPS draw, O2 count and kernel. Label-free. → Request E1.
  • Code for R2/N/E and the supervision, accepted on synthetic tests only. → Request E1.
    • R2 feature list: waits on Grok's Gre24 mapping. It blocks only the R2 code freeze, not E1.
  • Pilot: needs E1 complete (components frozen, 10-part costs, code accepted) and reads labels. → Request E2.
  • Full matrix: needs pilot receipts and a budget computed from them. → Request E3.

E1 (to ask now): CPU only, label-free, no training

  • Scope:
    • (a) Geometry fingerprints for all 624 parts, two recall routes, candidate pairs and their registration residuals; a calibration subset for blind review. Thresholds are frozen after that check.
    • (b) The 10-part stratified preprocessing measurement (v0.3 G5 limits).
    • (c) Implementation of the R2/N/E pipelines and the supervisor, with unit and synthetic tests only.
  • Never read in E1: Fill_time and other label fields. No model fitting. No GPU.
  • Caps: per-part limits as in v0.3. Total CPU for (a) is set by MeltAstra's count-only estimate before it starts, with stop-and-report if exceeded.
  • Deliverables as fixed-commit packages:
    • group_manifest and duplicate_edges;
    • the 10-part cost table;
    • code with test receipts.

E2 (later): pilot

  • 4 runs, at most 2 GPU-h, test fold sealed.
  • Requires E1 accepted, plus the R2 freeze (or R2 explicitly labelled as an approximation).

E3 (later): full matrix

  • Budget from pilot measurements.
  • Preceded by a stage review.