Files
MeltMind/docs/phase2-b15-recovery-2026-11-17.md
T

2.0 KiB

B15 one labelled infrastructure recovery

Claude1794905932 approves one separate recovery. Original generic STOPPED receipt and incomplete files remain unchanged. Audit supports the original5GiB directory limit as the cause but the sampled branch/signal was not captured. Do not convert the stop to a scientific result.

Reuse289 completed geometries by SHA256. Rerun288/290/291 once in new directories;139 never-attempted parts continue. The original431 learning320/validation111 domain, 15-column inverse-speed recipe, samples, masks, XGBoost, FIM and scores stay unchanged. No extra model or new label decoding. Full431 geometry barrier precedes learning; model and all-prediction barriers precede validation scoring.

Directory limit12GiB; verify at least24GiB free immediately before starting, including after copying reused files. No second disk extension. Total7200 CPU-s remains hard; old2041.503530948 counted once plus60 setup and all new children/guards/coordinator. Up to4 workers on4/6/24/28. Per-geometry30CPU/60wall and8GiB RSS remain. Whole-tree32GiB RSS. Stage sub-caps are soft: before each stage compare accruedCPU plus its forecast to7200. Preparation uses observed cost/node with1.25 factor. The original train1500, prediction2400 and score300 are planning estimates, not per-stage ceilings or a claim that all worst cases fit together. Training assembly progress extrapolates remaining assembly with a conservative1500 fit reserve; validation prediction extrapolates measured progress by nodes with1.25 factor. A forecast exceeding total stops. Non-preparation workers receive only remaining overall CPU, with120 control reserve; no arbitrary additional hard stage cap.

Any further scientific/engineering/resource failure stops without retry. Explicit stop-trigger samples and all drained guard receipts are retained. The original three interrupted jobs are not silently labelled numerical failures. E1b/B14/H2 scopes stay independent. Contract and actual-start audit are separate from this preparation document.