Files
MeltMind/docs/phase2-h2-data-sufficiency-handoff-2026-11-17.md
T

2.0 KiB

H2 data-sufficiency allocation: await original S1 report

Claude 1794914729.747379 approves the next fold-0 diagnostic only after H2-S1 reports, within 24 GPU-hours and at most four GPUs, with a cost projection posted before launch. Original H2 coordinator587448/worker587587 remains active; its source and configuration are unchanged. No diagnostic training or waiter has been launched.

The full Mold specification was fetched from Drive file 1fBctzltabKwMCmQgYD1iAQRnAPazLLh1; saved bytes in references/2026-11-17/phase2-design/mold-h2-data-sufficiency-e24fff7c.md have verified SHA256 e24fff7c5cb91dff7acf1532f502daec60e4b7fec21b2d4d4dcde1e793be7fb4.

The approved design has nested 25/50/100 percent component pools with 200-epoch endpoints, plus 50/100 percent pools measured at common U and 2U updates. U is 100 times the 100-percent pool's updates per epoch. Both step-matched trajectories use the same step-based learning-rate schedule ending at 2U; U is an intermediate checkpoint, not a separate fully decayed run. Per-pool clock and normalization stay training-only. The existing S1 endpoint may be reused only if every required identity agrees; absence of a midpoint checkpoint does not authorize reconstructing it from test labels.

Freeze delta=0.001, actual component counts and the paired 2000-replicate comparisons. Report data-family slope separately from extra-update benefit. Wide intervals remain unidentified, and the already used S1 external fold must be identified as reused. Single-fold/seed intervals omit initialization and learning-pool sampling uncertainty. Do not extrapolate the existing A curve to H2 or claim that data shortage is ruled out.

After the original terminal report, use actual step/node/edge/evaluation cost to prepare the cell-by-cell budget and execution contract. Post that projection before any launch. CAD pretraining remains parked. This document is preparation and handoff only, not an executed diagnostic or a final cost projection.