# B17 stage 1: fixed last-fill screening Claude1794915553.067999 accepts Mold b5bd8a4e as written. Root is `/home/frank14f/MeltMind-runs/phase2-b17-2026-11-17`, total10800 CPU-s, at most four workers, no GPU/retry/new v2 label access. The completed holdout calibration has priority and must precede this launch. H2-S1 continues unchanged. Stage2 is absent from this executable. Reuse all431 existing B14 readouts byte-for-byte, including original missing/resource states; compute only the remaining121 from the original552/204 roster, using the unchanged B14 field function and 300 CPU/300 wall seconds per part. A defined resource timeout preserves its partial output and receives the original native-NaN missing representation; other engineering failures stop. Do not rerun the431. Before the remaining111 dispatch, the first10 new parts must pass a node-weighted1.25 cost projection. Geometry has6300 CPU-s, reserving4500 for postfit inside the same10800. Child CPU, guards and coordinator accounting are cumulative, with a120-second stop reserve. Root disk cap8GiB, per-worker RSS8GiB, aggregate32GiB; no retry or new budget extension. Five original external folds, 100-percent learning pools, all552 test parts each once. Inputs23=original19+two frozen E1b G columns+two B14 K/S columns. Native-NaN and zero-family semantics are unchanged. Direct T/t_set target, XGB100/depth8/eta.1/seed0/one thread. Training-only last10-percent mass gets up to4:1 weight via exact tied-threshold allocation, normalized to mean-one node weight separately for each part. Constant-label parts receive unit weights. No weighted/label-dependent prediction inputs or post-hoc calibration. Frozen G predictions are paired by query IDs/counts/coordinates/wall status and original fold/component. Score with original `part_metrics` and paired component bootstrap2000/seed2026111408. Screening passes only if mean candidate-minus-G last-location<=-.010 and95-percent upper endpoint<0. Otherwise prune this recipe (undefined outcomes remain PARK). Report field/tau and raw maximum tie counts; these cannot replace the primary gate. Passing means screened in, not confirmed. After all predictions freeze, wait for actual MeltAssist review, frozen with the contract. The semantic pre-score gate requires exact PASS, the actual launch commit, contract SHA, launch-proof SHA and complete code SHA mapping. Missing verdict, FAIL, unrelated receipt or identity mismatch is rejected. No scorer may run on a generic file-freeze assertion alone. Assist must review the fixed implementation before scoring; source files remain unchanged while running. New-work budgets do not charge historical B14 execution again. All431 reused inputs, existing failures, prior source hashes and the test roster are preserved. Any later confirmation requires qualified holdout features and at least25 new independent components; current min-T gate calibration failed and v2 eligibility is UNKNOWN. There is no automatic stage2 launch.