MeltAstra
|
d3c94a0069
|
Preserve terminal seed1 continuation per-fold projection stop and full raw evidence
|
2026-11-18 16:34:19 +08:00 |
|
MeltAstra
|
90085f1842
|
Record actual single seed1 continuation launch and independent PASS
|
2026-11-18 15:19:06 +08:00 |
|
MeltAstra
|
9535201ac7
|
Freeze single labelled seed1 continuation with old cost inside final ceilings
|
2026-11-18 15:12:21 +08:00 |
|
MeltAstra
|
a45e375d0e
|
Preserve seed1 projected-budget stop with complete raw terminal evidence
|
2026-11-18 14:55:40 +08:00 |
|
MeltAstra
|
8108e52cd5
|
Record adopted seed1 PASS and actual two-worker launch with first-epoch cost gates
|
2026-11-18 14:46:16 +08:00 |
|
MeltAstra
|
8c5020c5cb
|
Fix seed1 dispatch to select actually idle eligible GPUs before assignment
|
2026-11-18 14:38:42 +08:00 |
|
MeltAstra
|
c0f89a5e95
|
Preserve item1 terminal results and freeze seed1 training review entry
|
2026-11-18 14:31:37 +08:00 |
|
MeltAstra
|
888f706612
|
Freeze Track A postfit entry and record actual item1 recovery start
|
2026-11-18 14:19:09 +08:00 |
|
MeltAstra
|
581208098f
|
Prepare one labelled item1 postfit recovery with bounded idle wait
|
2026-11-18 14:04:43 +08:00 |
|
MeltAstra
|
4f646232f4
|
Record actual independent Track A review adoption and unique GPU training start
|
2026-11-18 12:29:47 +08:00 |
|
MeltAstra
|
2cf0a0307d
|
Prepare reviewed-scope Track A H2 training entry and synthetic acceptance
|
2026-11-18 12:18:33 +08:00 |
|
MeltAstra
|
1eae27ade8
|
Verify Track A baseline reuse and existing complete v4 graph inputs
|
2026-11-18 11:53:30 +08:00 |
|
MeltAstra
|
10ca86a920
|
Archive original Track C and D proposals and research direction clarifications
|
2026-11-18 11:42:04 +08:00 |
|
MeltAstra
|
98519a6c36
|
Include actual parallel budget review with S2 diagnostic results
|
2026-11-18 10:32:57 +08:00 |
|
MeltAstra
|
73b531a3dd
|
Publish complete descriptive S2 volume-tail and peak diagnostic
|
2026-11-18 10:31:51 +08:00 |
|
MeltAstra
|
1ed44f70fc
|
Enforce running coordinator CPU allowance for S2 diagnostic
|
2026-11-18 10:27:28 +08:00 |
|
MeltAstra
|
b97674a1d4
|
Prepare descriptive S2 volume-tail diagnostic for lightweight code review
|
2026-11-18 10:15:29 +08:00 |
|
MeltAstra
|
a5f44f3a5a
|
Receive Mold item c volume-tail and peak-stability paper specification
|
2026-11-18 09:44:00 +08:00 |
|
MeltAstra
|
34aedf01d9
|
Record mandatory independent six training receipt monitor audit before postfit
|
2026-11-18 06:10:59 +08:00 |
|
MeltAstra
|
bb888c902f
|
Accept exact item1 postfit PASS and validate runtime review binding
|
2026-11-18 05:59:03 +08:00 |
|
MeltAstra
|
365460302b
|
Reject lower-level monitor errors in item1 postfit wrapper; preserve original receipt
|
2026-11-18 05:52:26 +08:00 |
|
MeltAstra
|
1f7fccbbfa
|
Prepare one item1 postfit review with runtime custody and unchanged comparison
|
2026-11-18 05:44:42 +08:00 |
|
MeltAstra
|
1c6aeeb566
|
Publish exact item1 review, unique actual start and first-four cost gates
|
2026-11-18 05:04:01 +08:00 |
|
MeltAstra
|
ae089067a1
|
Prepare amended phase3 item1 six-fit entry with complete schedules and120000GPU-s cap
|
2026-11-18 04:55:33 +08:00 |
|
MeltAstra
|
30c34b0e66
|
Prepare phase3 item1 frozen training entry for exact semantic review
|
2026-11-18 04:50:41 +08:00 |
|
MeltAstra
|
2338dfe997
|
Publish H2-S2 terminal evidence, independent audit and descriptive folds1-4
|
2026-11-18 04:44:33 +08:00 |
|
MeltAstra
|
b89762e925
|
Publish complete gate outcome evidence and conditional phase3 plan
|
2026-11-18 00:15:13 +08:00 |
|
MeltAstra
|
e90d964146
|
Publish new canonical gate postfit review binding and unchanged Assist literature
|
2026-11-17 23:19:18 +08:00 |
|
MeltAstra
|
015cb14dfa
|
Publish measured gate v2 continuation start and adopted S2 semantic PASS
|
2026-11-17 23:06:24 +08:00 |
|
MeltAstra
|
8354a2f6c0
|
Publish exact H2 S2 pooled scorer review binding, no postfit launch
|
2026-11-17 22:56:30 +08:00 |
|
MeltAstra
|
0436fba83f
|
Publish actual H2 S2 start and passing four-fold first-epoch cost gate
|
2026-11-17 22:23:18 +08:00 |
|
MeltAstra
|
508ea39d00
|
Freeze four-fold H2 S2 training queue and cumulative budget
|
2026-11-17 22:17:38 +08:00 |
|
MeltAstra
|
5fbf24ed53
|
Publish H2 S1 final200 predictions scores review and terminal evidence
|
2026-11-17 21:57:37 +08:00 |
|
MeltAstra
|
7c6ea4f312
|
Freeze H2 final200 prediction and scoring entry for semantic review
|
2026-11-17 21:48:50 +08:00 |
|
MeltAstra
|
0a45935ee4
|
Record conditional calibration review scope and actual H2 dependency audit
|
2026-11-17 21:14:55 +08:00 |
|
MeltAstra
|
7e2afaf2c6
|
Record final calibration budget amendment and preserve exact original PASS identity
|
2026-11-17 21:04:48 +08:00 |
|
MeltAstra
|
1960762d2d
|
Publish fixed calibration postfit implementation and pre-score review binding
|
2026-11-17 20:43:20 +08:00 |
|
MeltAstra
|
d67da6382b
|
Publish B17 terminal evidence and gate calibration v2 fixed execution scope
|
2026-11-17 20:23:41 +08:00 |
|
MeltAstra
|
1e1d5a6515
|
Publish bounded phase2 decisions and immutable evidence mapping without bulk history
|
2026-11-17 19:39:05 +08:00 |
|
Frank14f
|
783608f73b
|
Freeze B13 E1 five-fold test confirmation and exact baseline reuse
|
2026-11-17 16:37:38 +08:00 |
|
Frank14f
|
76dea96bd2
|
Publish audited B1 B12 B13 B10 B14 terminal decisions and retained limitations
|
2026-11-17 16:23:21 +08:00 |
|
Frank14f
|
7a91633244
|
Freeze approved B15 fixed tet-speed supervised solver gate
|
2026-11-17 16:23:00 +08:00 |
|
Frank14f
|
7a7174746d
|
Freeze approved H2 S1 fold0 last-epoch200 training amendment
|
2026-11-17 16:08:56 +08:00 |
|
Frank14f
|
6c42bfb1ce
|
Freeze reviewed H2 pilot contract data guards and cost projection
|
2026-11-17 15:41:12 +08:00 |
|
Frank14f
|
c1e2077e8a
|
Record sole B12 B13 serial launch and CPU isolation
|
2026-11-17 14:56:48 +08:00 |
|
Frank14f
|
b685ecd3f3
|
Freeze approved B12 path and B13 context one-fold gates
|
2026-11-17 14:55:26 +08:00 |
|
Frank14f
|
24f8a97e33
|
Record Claude stage consolidation and bounded future dependencies
|
2026-11-17 14:22:41 +08:00 |
|
Frank14f
|
da1efdb1d9
|
Consolidate terminal B6 B7 B11 evidence and sole live B1 recovery
|
2026-11-17 14:21:22 +08:00 |
|
Frank14f
|
0cb8e9fe5d
|
Publish complete B6 HKS gate with all fields and numerical evidence
|
2026-11-17 14:18:52 +08:00 |
|
Frank14f
|
97cefdb2e0
|
Publish full-panel labelled B11 A H1 continuation and raw evidence
|
2026-11-17 14:15:44 +08:00 |
|