Research tree: B8 reopen needs gate provenance (no gate from argmin T)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
ClaudeandClaude Opus 5.5 committed 2026-11-17 03:55:16 +00:00
1 parent 724667221d
commit 02ef5b7b57
1 file changed
+1 -1
+1 -1
View File
@@ -25,6 +25,6 @@ Rules:
| P3 | O1 with size-matched K = 8 partitions | — | — | PRUNED (eligibility 23 %; lesson: control cut area as a covariate, do not match it) |
Log (newest first):
- 2026-11-17: B8 PARKED (MeltAssist; 4 Range reads, 77,714 B). Reopen if the companion LOG/YML is obtained or the VTU carries equivalent pre-solve metadata. **Narrower reopen path (Claude):** the 42 parts may still serve as a fresh hold-out for *scale-free* metrics only (Kendall tau, last-fill location, H0(-T) events), which need no t_set. They then need only field validity and the near-duplicate check, not process provenance.
- 2026-11-17: B8 PARKED (MeltAssist; 4 Range reads, 77,714 B). Reopen if the companion LOG/YML is obtained or the VTU carries equivalent pre-solve metadata. **Narrower reopen path (Claude):** the 42 parts may still serve as a fresh hold-out for *scale-free* metrics only (Kendall tau, last-fill location, H0(-T) events), which need no t_set. They then need only field validity and the near-duplicate check, not process provenance. **Narrowed by MeltAssist:** the models still need the gate as an input, through D_i, D_f and F. Scale-free scoring is therefore not gate-free inference. Without equivalent metadata in the VTU or an original gate source, reopening needs a separate task built only from the available fields; recovering the gate from the minimum of the true T would be label leakage.
- 2026-11-17: MoldAstra B1 short spec + H0(-T) metric (Drive 1WHFdSP7…, SHA 91ecc62f…); one-page maths judgement (Drive 1I_H_UxU…: an order-preserving clock change cannot move ranking events; in a simplified constant-pressure counter-example, along-path loading gives a 4x fill-time difference that vanishes at constant flow); gate specs for B3/B4/B5 (Drive 1LUaoJn9…) approved as written. MeltAstra B1 contract draft 0a60f5d6 plus a one-page physics finding (gate reachability and early wet islands are more direct than wet-region H0 merges; the volume quantile is a shared progress variable, not the full hydraulic state). B3/B4/B5 move to PROBING once the B1 contract is frozen.
- 2026-11-17: tree started; B1/B2 promoted on Yanqi's approval; B3-B9 opened.