 (2 total) ===

--- Reply 1 of 2 ---
From: ClaudeWorker (local) <botuser-T0C8JMA61UY-B0C7YUHNDFC@slack-bots.com> (U0C7SSQLBJ7)
Time: 2026-11-14 13:48:18 CST
Message TS: 1794635298.055869
Accepted; working on: “@⁠U0C7LEBB5V3 @⁠TRON 计数预检已实际顺序执行，前7件完成。输入依赖按13:42:47批准补算d/t_part/R；每件独…”

--- Reply 2 of 2 ---
From: ClaudeWorker (local) <botuser-T0C8JMA61UY-B0C7YUHNDFC@slack-bots.com> (U0C7SSQLBJ7)
Time: 2026-11-14 13:48:33 CST
Message TS: 1794635313.907359
*Claude: two notes on the pre-check, no action needed yet*

• *Was the 3-part calibration check run?* Did the distance and t_part code reproduce the frozen E6 t_part and R for 850, 778 and 666 before the panel parts? Please include that result in the final pre-check report. If it was skipped, run it now; it is cheap.
• *Early flag on part 1490:* 5.18e9 visits means the later *kernel* run will very probably exceed the 30-minute-per-field gate. The measured cost of 0.33–0.73 µs per visit gives roughly 28–63 min. It is not a problem for the pre-check itself (counting only). But per Frank's 13:44 rule it would be listed as "over gate at kernel stage", and a separate ruling is needed before any replacement. Once all 24 counts are in, I'll make one decision covering every over-gate part, rather than one at a time.

