docs(oid): consolidate documentation and organize data directories
- Fix illusion rank sensitivity inconsistency (0.75L std=0.26, not 1.000) - Unify all dates to 2026-06-28 across 4 markdown files - Remove empty derived/delta_fields/ directory - Update README reading order and scope date Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
parent
225f653840
commit
f66671a498
@ -1,5 +1,5 @@
|
|||||||
# OID Analysis: Final Conclusions
|
# OID Analysis: Final Conclusions
|
||||||
## (Phase 2 completed 2026-06-15)
|
## (Phase 2 completed 2026-06-28)
|
||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
|
|||||||
@ -84,7 +84,7 @@ ff.context.pop()
|
|||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
## Current Results (Complete Phase 2, 2026-06-22)
|
## Current Results (Complete Phase 2, 2026-06-28)
|
||||||
|
|
||||||
### steady_cloak
|
### steady_cloak
|
||||||
|
|
||||||
@ -125,7 +125,8 @@ ff.context.pop()
|
|||||||
| Metric | 0.75L | 1.0L | 1.5L |
|
| Metric | 0.75L | 1.0L | 1.5L |
|
||||||
|--------|-------|------|------|
|
|--------|-------|------|------|
|
||||||
| Correction-field POD energy (5 modes) | 99.93% | 99.91% | 97.9% |
|
| Correction-field POD energy (5 modes) | 99.93% | 99.91% | 97.9% |
|
||||||
| Rank sensitivity | 1.000 | 1.000 | 1.000 |
|
| POD cosine sim (robustness) | 1.000 | 1.000 | 1.000 |
|
||||||
|
| Rank sensitivity std (r=6-16) | **0.26** (unstable) | 0.03 (stable) | 0.02 (stable) |
|
||||||
| N snapshots (POD) | 100 | 100 | 100 |
|
| N snapshots (POD) | 100 | 100 | 100 |
|
||||||
| Force-OID S[0] | 0.699 | 1.447 | 0.981 |
|
| Force-OID S[0] | 0.699 | 1.447 | 0.981 |
|
||||||
| Force-OID S[1] | 0.671 | 0.832 | 0.407 |
|
| Force-OID S[1] | 0.671 | 0.832 | 0.407 |
|
||||||
|
|||||||
@ -7,7 +7,7 @@ Does NOT repeat confirmed facts or hard rules (see OID_knowledge.md).
|
|||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
## Overall Status: COMPLETE (Phase 2 delivered 2026-06-22)
|
## Overall Status: COMPLETE (Phase 2 delivered 2026-06-28)
|
||||||
|
|
||||||
All planned work is done. Repository is ready for handover.
|
All planned work is done. Repository is ready for handover.
|
||||||
|
|
||||||
|
|||||||
@ -17,7 +17,7 @@ This directory implements an **OID (Observable-Inferred Decomposition)** pipelin
|
|||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
## Current scope (as of 2026-06-22)
|
## Current scope (as of 2026-06-28)
|
||||||
|
|
||||||
**All 5 scenes analyzed end-to-end:**
|
**All 5 scenes analyzed end-to-end:**
|
||||||
|
|
||||||
|
|||||||
Loading…
Reference in New Issue
Block a user